At 2,000 usable sq ft per month
THE KRAKEN / INDUSTRIAL DTF
An eight-head printing platform.
A bigger palette of possibilities.
Expanded gamut + fluorescent options*
THE COLOR BEAST. IN MOTION.
THE PLATFORM BEHIND THE POSSIBILITIES.
Get to know the hardware. Then take a closer look at how the system fits together.
Take the machine tour ↓*Color options and production performance depend on the selected configuration and print mode.
YOUR FRONT-ROW LOOK AT KRAKEN.
Choose a component. Follow the process from the print engine to the finished roll.
SYSTEM OVERVIEW
Explore the printer, motion platform, matching smart duster and film take-up. See where each part fits in your production workflow.
Choose a feature below or start the guided tour.
Explore the complete system photograph, then play footage of the print engine and real finished prints. The drive and duster views show their position within the system.
MULTIPLE COLOR MODES. ONE KRAKEN.
Expanded gamut. Fluorescent options.
Build a color configuration around the work you want to make.
Choose a 9–13-color configuration from the options below. Your selected setup determines the exact ink combination.
Swatches illustrate the available ink colors. Evaluate physical prints for color and fluorescence.
NOW, SEE THE DIFFERENCE.
Flip the switch and watch SG51 go from a subdued color simulation to the full-color T-shirt mockup.
VIEWING CMYK SIMULATION


PLAN YOUR PRODUCTION SPACE.
A clear view of the equipment, work areas, and power connections—before you plan your installation.
Retains the source room allowance, with all three work areas highlighted.
Equipment only: 12′9″ × 8′1″ · 153 × 97 in
The 18′9″ × 14′1″ overall layout includes 36 inches behind the printer for loading rolls and a 3′ × 3′ work area at both the driver side and take-up reel. Plan any additional aisles, delivery routes, and service access around this space. We’ll review your layout, work-area clearances, ventilation, delivery path, and electrical connections before installation.
THE COLOR GETS ATTENTION. THE NUMBERS MATTER.
Compare buying finished transfers with producing the same volume in-house. Adjust the assumptions and watch your estimated payback change.
Use the same usable transfer area for both options.
Include supplier shipping.
Equipment, freight & setup.
Per raw sq ft, before usable-yield adjustment.
Accounts for layout waste and reprints.
Estimated allowance for labor, electricity, maintenance and other running costs. Calculated on materials after yield; adjust to match your shop.
At 2,000 usable sq ft per month
Cumulative operating savings minus initial investment.
No email needed to calculate. Your inquiry can include this scenario.
Monthly savings = outsourced transfer cost − in-house materials − labor & operating contingency.
Materials = usable square feet ÷ yield × materials cost per raw square foot.
Labor & operating contingency = materials after yield adjustment × contingency percentage. This simplified allowance estimates labor, electricity, maintenance and other running costs together. Actual operator hours are not modeled. It excludes the equipment purchase and is not a fixed monthly charge.
Simple payback = installed investment ÷ positive monthly savings. Annual operating savings equals 12 months of savings and does not deduct the initial purchase. The chart does deduct the purchase.
This compares the same finished-transfer volume at constant costs. It assumes no new sales, does not validate production capacity, and excludes financing, taxes, depreciation and resale value. Common garment and pressing costs cancel only when they are the same in both workflows. Add any differences to your inputs.
LET’S GET PRACTICAL.
Kraken offers configurations from 9 to 13 colors. Start with the artwork and applications you produce most often, then explore the available expanded-gamut and fluorescent options with physical samples. Your quote defines the exact ink configuration.
Review the printer, matching duster, RIP software, computer, starter supplies, installation, and training with the team. Your quote defines the exact package and any separately priced services or accessories.
This version compares outsourced transfers with new in-house production. An upgrade comparison needs your current machine’s operating costs, remaining costs, and production constraints; ask us to work through that scenario with you.
Confirm power, ventilation, working clearances, access for delivery, and room conditions using the checklist for your selected system before scheduling installation.